Important Contractual Notice: By utilizing this website, requesting a detailed solar engineering audit, or executing a proposal from PV Power Technologies Pvt. Ltd., you agree to be bound by these Terms & Conditions and any project-specific Master Service Agreement (MSA) signed between the parties.
Clause 01
Agreement & Acceptance
These Terms & Conditions constitute a legally binding agreement between you (whether individually or on behalf of an enterprise entity) and PV Power Technologies Pvt. Ltd. (CIN: U40108MH2008PTC184478), having its corporate headquarters at Office No 1014, 10th Floor, ATL Corporate Park, Saki Vihar Road, Tunga Village, Mumbai - 400072, Maharashtra, India.
If you do not agree to these terms, you must discontinue the use of our website and digital calculation tools immediately. In the event of any direct conflict between these general website terms and a formally executed Engineering, Procurement & Construction (EPC) Agreement, the terms of the signed EPC Agreement shall prevail.
Clause 02
Solar Feasibility & ROI Calculator Disclaimers
Our website features interactive Solar ROI intelligence calculators, capacity estimators, and indicative financial metrics designed to provide approximate benchmarks for decision-makers:
- Indicative Projections: Savings projections, payback horizons, and kilowatt-peak (kWp) system estimates are indicative estimations based on average regional Global Horizontal Irradiance (GHI), standard DISCOM tariff schedules, and Tier-1 TopCon module specifications.
- Site-Specific Variations: Actual energy generation is subject to physical 3D shade analysis, exact roof pitch, civil structural orientation, seasonal climate variations, and DISCOM grid availability.
- Binding Quotations: Binding commercial figures and generation guarantees are provided exclusively upon completion of a physical geotechnical/shadow audit and formal PVsyst technical design by PV Power Tech engineering teams.
Clause 03
Turnkey EPC Contracts & Scope of Work
For all commercial, industrial, and institutional solar installations, PV Power Tech delivers comprehensive turnkey EPC execution encompassing:
1. Engineering & Design
- Detailed electrical Single Line Diagrams (SLD)
- 3D shade simulation and string layout mapping
- Structural load calculations (STAAD.Pro verified)
2. Procurement & Quality
- Tier-1 ALMM-listed Monocrystalline / TopCon PV modules
- IEC / CE certified solar string / central inverters
- Anodized aluminium & HDG mounting structures (150 km/h wind-rated)
3. Civil & Electrical Construction
- Mechanical module mounting & weather-proof ballasting
- AC/DC cabling, combiner boxes & SPD surge protection
- Dedicated chemical earthing pits & lightning arrestors
4. Testing & Commissioning
- Pre-commissioning string insulation & IV curve testing
- CEIG electrical safety inspectorate approvals
- Grid synchronization & bidirectional net-meter integration
Clause 04
Site Readiness & Structural Safety
The client/asset owner is responsible for ensuring:
- Roof Integrity: The installation roof or land parcel possesses adequate structural load-bearing capacity (minimum 15–20 kg/sq.m dead load capacity) to support the solar array for 25+ years.
- Unrestricted Site Access: Providing safe and unobstructed ingress/egress for installation personnel, materials, cranes, and commissioning teams during designated working hours.
- Water & Electricity for Construction: Supplying auxiliary single-phase power and clean water during erection, testing, and module cleaning.
Clause 05
DISCOM Permitting & Net-Metering
PV Power Tech acts as the client’s authorized EPC partner to prepare, submit, and track all statutory applications with the relevant State Electricity Distribution Company (DISCOM), Chief Electrical Inspector to Government (CEIG), and State Nodal Agencies:
- Approval Timelines: While PV Power Tech expedites processing with full statutory rigor, approvals and bidirectional meter replacements are subject to DISCOM inspection queues, distribution transformer capacity limits, and local utility regulations.
- Client Cooperation: The client agrees to furnish necessary title deeds, sanctioned load documents, electricity bills, and NOCs promptly upon request.
Clause 06
Subsidies & Tax Incentives
Government incentives, central financial assistance (such as PM Surya Ghar subsidies), and accelerated depreciation (Section 32 of Income Tax Act) are governed by applicable government notifications and tax laws:
- Direct Subsidy Disbursement: Under central schemes, approved subsidies are credited directly by the National Portal/MNRE into the eligible beneficiary’s verified bank account.
- Tax Advisory Disclaimer: Accelerated depreciation figures provided on this site are for informational modeling. Clients are advised to consult their chartered accountants or tax advisors for entity-specific tax filings.
Clause 07
Warranties & Performance Standards
All solar power systems deployed by PV Power Tech are backed by Tier-1 manufacturer warranties and our comprehensive EPC workmanship guarantee:
| Equipment / Component |
Standard Warranty Term |
Warranty Scope & Assurance |
| Tier-1 Solar PV Modules |
25 Years Linear Performance |
Minimum 90% peak output at Year 10; minimum 80% output at Year 25 + 12-Year Product Warranty. |
| Grid-Tied Solar Inverters |
5 to 10 Years (Extendable to 20 Yrs) |
Manufacturer replacement / repair against internal electrical or component defects. |
| Mounting Structures (Aluminium / HDG) |
10 to 25 Years |
Guaranteed against structural fatigue, corrosion, and wind loads up to 150 km/h. |
| Workmanship & EPC Execution |
1 to 5 Years Comprehensive |
Zero-cost remediation of cabling, connections, civil anchoring, or installation defects. |
Clause 08
Operations & Maintenance (O&M) & Cloud SCADA
Comprehensive O&M agreements include 24/7 cloud telemetry, automated fault diagnosis, scheduled module washing schedules, and periodic thermographic drone scans. Unauthorized third-party modifications, unapproved inverter firmware changes, or tampering with electrical balance of system (BOS) components will void active warranties.
Clause 09
Intellectual Property
All content, logos, diagrams, 3D engineering designs, calculation algorithms, website design systems, and multimedia published on this website are the proprietary intellectual property of PV Power Technologies Pvt. Ltd. and are protected by Indian and international copyright and trademark laws.
Clause 10
Limitation of Liability
To the maximum extent permitted by applicable law, PV Power Tech shall not be liable for any indirect, consequential, punitive, or special damages arising out of grid outages, DISCOM curtailment, power outages caused by external transmission failures, natural calamities, or force majeure events.
Clause 11
Force Majeure
Neither party shall be held liable for failure or delay in fulfilling contractual obligations where such failure arises from acts of God, earthquakes, severe cyclones, civil unrest, grid blackouts, epidemics, or changes in statutory import tariffs beyond reasonable commercial control.
Clause 12
Dispute Resolution & Governing Law
These Terms & Conditions and all contractual engagements shall be governed by and construed in accordance with the laws of the Republic of India. Any disputes arising hereunder shall be subject to amicable mutual conciliation, failing which they shall be referred to arbitration in Mumbai under the Arbitration and Conciliation Act, 1996. The courts in Mumbai, Maharashtra shall have exclusive jurisdiction.
Corporate Legal Contact
Legal Entity:
PV Power Technologies Pvt. Ltd.
Corporate Office:
Office No 1014, 10th Floor, ATL Corporate Park, Saki Vihar Road, Tunga Village, Mumbai - 400072, India